SUA CONSTRUCTION
Seacoast Utility Authority is committed to excellence in customer service. Part of that commitment is to ensure the existing water and sewer infrastructure is replaced on an ongoing and timely basis ensuring reliable utility service to its’ customers. This page provides information on some of the ongoing projects to meet our goal of excellence.
Quick Links
- Interactive Construction Project Map
- Email capitalprojects@sua.com for constuction inquires.
Hidden Key (Point Way) Low Pressure Force Main
-
- Installation of a Low Pressure Force Main to give residents the ability to connect to SUA’s sewer system.
- Construction will take place on Point Way in the Hidden Key Neighborhood.
- Restoration of all areas disturbed by construction activities, including, but not limited to: Roadways; Driveways; Sidewalks; Existing utilities; Irrigation; Sodding; Landscaping; Mailboxes; Light poles; and Pavement striping.
- Short term lane closures will be required throughout the duration of the project.
- Municipality: Unincorporated Palm Beach County. In the Palm Beach Gardens Area.
- Contractor: Seacoast Utility Construction Team
- Construction Engineer: Seacoast Utility Engineer Team
- Status: Design
- Estimated Start Date: Late 2025.
Lake Park 8A & 8C Water Main Improvements
-
- Installation of a new water main, water services for each residence, and fire hydrants. Replacing a water distribution system that is reaching the end of its useful life.
- Abandonment, or removal and disposal of the existing water main.
- Construction will take place in the Lake Park neighborhoods 8A & 8C between Northlake Blvd and Jasmine Dr. from Prosperity Farms Rd. / 10th St, east to Flagler Blvd.
- Restoration of all areas disturbed by construction activities, including, but not limited to, roadways, driveways, sidewalks, existing utilities, irrigation, sodding, trees, landscaping, mailboxes, light poles, and thermoplastic striping.
- Municipality: Town of Lake Park
- Contractor: TBD
- Design Engineer: CES Consultants
- Status: Design
- Estimated Start Date: End of 2024 / Beginning of 2025.
Horseshoe Acres Water Main Improvements
-
- Installation of a new water main, water services for each residence, and fire hydrants. Replacing a water distribution system that is reaching the end of its useful life. Replacing of a ductile iron pipe water main aerial crossing of the canal between Horseshoe Acres and Steeple Chase with HDPE pipe via Horizontal Directional Drill.
- Abandonment, or removal and disposal of the existing water main.
- Construction will take place in the Horseshoe Acres neighborhood, including streets Kelso Dr, Nashua Dr., Citation Dr., Damascus Dr., Mongo Way., Swaps Way., Travelers Way., and Needles Dr.
- Restoration of all areas disturbed by construction activities, including, but not limited to, roadways, driveways, sidewalks, existing utilities, irrigation, sodding, trees, landscaping, mailboxes, light poles, and thermoplastic striping.
- Municipality: Palm Beach Gardens.
- Contractor: TBD
- Design Engineer: EAC Consulting, INC.
- Status: Design
- Estimated Start Date: End of 2024 / Beginning of 2025
Lift Station 57 Force Main Replacement
-
- Installation of approximately 1,500’ of 6” PVC C900 force main via open cut method, replacing existing ductile iron force main that has reached the end of its useful life.
- Construction will be in the south west corner of the Mariners Cove development, out to Prosperity Farms Rd, and south to Flamingo Rd / Hood Rd.
- Municipality: Unincorporated Palm Beach County in the Palm Beach Gardens Area.
- Contractor: TBD
- Construction Engineer: Chen Moore & Associates
- Status: Pre-Construction
- Start Date: 2025
Harbor Lane Low Pressure Force Main.
-
- Installation of a Low Pressure Force Main to give residents the ability to connect to SUA’s sewer system.
- Construction will take place on Harbor Ln.
- Restoration of all areas disturbed by construction activities, including, but not limited to: Roadways; Driveways; Sidewalks; Existing utilities; Irrigation; Sodding; Landscaping; Mailboxes; Light poles; and Pavement striping.
- Short term lane closures will be required throughout the duration of the project.
- Municipality: Unincorporated Palm Beach County. In the Palm Beach Gardens Area.
- Contractor: TBD
- Construction Engineer: Chen Moore & Associates
- Status: Design
- Estimated Start Date: 2025.
Relocation of 12-inch Water Main and 12-inch Reclaimed Water Main on FIND Property and Ellison Wilson.
-
- Installation of 900 linear feet of 12” ductile iron pipe water main via open cut method including one fire hydrant and one flushing hydrant due to the improvements conducted by the F.I.N.D. on their property.
- Abandonment, or removal and disposal of the existing water mains.
- Construction will take place on the FIND property located at Ellison Wilson Rd and West Hemmingway Dr.
- Restoration of all areas disturbed by construction activities, including, but not limited to, roadways, driveways, sidewalks, existing utilities, irrigation, sodding, trees, landscaping, mailboxes, light poles, and thermoplastic striping.
- Municipality: Palm Beach County.
- Contractor: Deevan, INC
- Construction Engineer: Chen Moore and Associates
- Status: Under construction
Juno Isles West Water Main Improvements
- Installation of a new water main, water services for each residence, and fire hydrants.
- Abandonment, or removal and disposal, of the existing water main.
- The crossing of Ellison Wilson Road with the water main for future connections to service residents east of Ellison Wilson Road.
- Restoration of all areas disturbed by construction activities, including, but not limited to, roadways, driveways, sidewalks, existing utilities, irrigation, sodding, trees, landscaping, mailboxes, light poles, and thermoplastic striping.
- Municipality: Palm Beach County.
- Contractor: Centerline Utilities, Inc. / CES
- Construction Engineer: CES
- Status: In construction
Juno Isles East Water Main Improvements
- Installation of a new water main, water services for each residence, and fire hydrants. Replacing a water distribution system that is reaching the end of its useful life.
- Abandonment, or removal and disposal of the existing water main.
- Construction will take place in the Juno Isles neighborhood between U.S. Hwy 1 and Ellison Wilson Rd. from Ascott Rd. and Packwood Rd. south to Ardley Rd. and Juno Isles Blvd.
- Restoration of all areas disturbed by construction activities, including, but not limited to, roadways, driveways, sidewalks, existing utilities, irrigation, sodding, trees, landscaping, mailboxes, light poles, and thermoplastic striping.
- Municipality: Palm Beach County.
- Contractor: Amici Engineering Contractors
- Construction Engineer: Chen Moore and Associates
- Status: Pre construction
- Estimated Start Date: February 2025
Donald Ross Road Low Pressure Force Main
- Installation of approximately 300’ of 3” HDPE Low Pressure Force Main horizontally directional drilled under Donald Ross Rd. Installation of approximately 285’ of 2” low pressure force main from Harbor Ln. to the northeast corner of Old Donald Ross Rd. and Paradise Pointe Rd. Installation of approximately 790’ of 2” low pressure force main from Harbor Ln. to the Northwest corner of Old Donald Ross Rd. and Leeward Way.
- Construction will be in the areas of the North East Corner of the Azure development parking lot, underneath Donald Ross Rd., and along Old Donald Ross Rd. from Paradise Pointe Rd. to Leeward Way.
- Municipality: Palm Beach Gardens
- Contractor: Eastern Pipeline Construction
- Construction Engineer: Chen Moore and Associate
- Status: Under Construction
Captains Key Infrastructure Improvements
- Description: Replacement of all water main in the neighborhood that has reached the end of its useful life. Relocation and replacement of fire hydrants. Installation of a Low Pressure Force Main to give residents the ability to connect to SUA’s sewer system.
- Construction will take place in the Captains Key Neighborhood and US Highway 1 / Captains Key Dr. intersection.
- Restoration of all areas disturbed by construction activities, including, but not limited to: Roadways; Driveways; Sidewalks; Existing utilities; Irrigation; Sodding; Landscaping; Mailboxes; Light poles; and Pavement striping.
- Short term lane closures will be required throughout the duration of the project.
- Municipality: Unincorporated Palm Beach County.
- Contractor: Lazarus Group / CES
- Construction Engineer: CES Consultants
- Status: Under Construction.
Leeward Way Low Pressure Force Main
- Installation of a Low Pressure Force Main to give residents the ability to connect to SUA’s sewer system.
- Construction will take place on Leeward Way.
- Restoration of all areas disturbed by construction activities, including, but not limited to: Roadways; Driveways; Sidewalks; Existing utilities; Irrigation; Sodding; Landscaping; Mailboxes; Light poles; and Pavement striping.
- Short term lane closures will be required throughout the duration of the project.
- Municipality: Unincorporated Palm Beach County.
- Contractor: TBD
- Construction Engineer: TBD
- Status: Design
- Estimated Start Date: 2025.
Prosperity Farms Road C-17 Bridge-Water Main Replacement
- Description: Replacement of 16” and 12” ductile iron pipe water mains, including an aerial crossing.
- Construction will take place on Prosperity Farms Road from Hummingbird Way, north to Ibis Way.
- Restoration of all areas disturbed by construction activities, including, but not limited to: Roadways; Driveways; Sidewalks; Existing utilities; Irrigation; Sodding; Landscaping; Mailboxes; Light poles; and Pavement striping.
- Short term lane closures will be required throughout the duration of the project.
- Municipality: North Palm Beach.
- Contractor: TBD
- Construction Engineer: Chen Moore and Associates.
- Status: Design.
- Start Date: TBD.
Congress Avenue and Avocado Drive Utility Relocation
- Replacement of 420’ of 16” D.I.P water main via open cut, 60’ of 6” D.I.P. water main via open cut, and 420’ of 16” D.I.P. Raw water main via open cut. Replacement of approximately 450’ of 2” HDPE force main inside 52’ of proposed 4” casing and existing 398’ 4” casing, replacement of 100’ of 8” sanitary sewer. Installation of two manholes and two connections to existing system. Upgrading our water and sewer facilities prior to the Congress Avenue extension.
- Construction will take place on Loquat St / Park Ln and Avocado Ln. in the Unincorporated Palm Beach County Area.
- Restoration of all areas disturbed by construction activities, including, but not limited to: Roadways; Driveways; Sidewalks; Existing utilities; Irrigation; Sodding; Landscaping; Mailboxes; Light poles; and Pavement striping.
- Short term lane closures will be required throughout the duration of the project.
- Municipality: Palm Beach County.
- Construction Engineer: Chen Moore and Associates.
- Status: Under Construction.
CRYSTAL POINTE FORCE MAIN REPLACEMENT
- Installation of approximately 1,387’ of 6” HDPE force main via horizontal directional drill and 815’ of 6” PVC C-900 Dr-14 force main via open cut method, replacing existing ductile iron force main that has reached the end of its useful life.
- Construction will be in Crystal Pointe neighborhood of Palm Beach Gardens, FL. From the Lift station NO. 95, located in the Crytal Pointe clubhouse parcel, along the west plat line of Crystal Pointe, to the existing manhole at the north Hood Rd. right of way line.
- Municipality: Unincorporated Palm Beach County
- Contractor: Jamie Underground, Inc.
- Construction Engineer: CES Consultants, Inc.
- Status: Pre Construction
- Start Date: End of 2024
Pirates Cove Water Main Replacement and Low Pressure Force Main
- Description: Replacement of all water main in the neighborhood that has reached the end of its useful life. Relocation and replacement of fire hydrants. Installation of a Low-Pressure Force Main to give residents the ability to connect to SUA’s sewer system.
- Abandonment or removal and disposal of the existing water main.
- Construction will take place in the Pirates Cove neighborhood on streets including Kidd Ln., Teach Rd., E. Teach Rd., and Avery Rd.
- Restoration of all areas disturbed by construction activities, including, but not limited to: Roadways; Driveways; Sidewalks; Existing utilities; Irrigation; Sodding; Landscaping; Mailboxes; Light poles; and Pavement striping.
- Short-term lane closures will be required throughout the duration of the project.
- Municipality: Unincorporated Palm Beach County. In the Palm Beach Gardens Area.
- Contractor: CES
- Construction Engineer: CES Consultants
- Status: Design
- Estimated Start Date: TBD.
Old Port Cove Main Replacement
- Installation of approximately 1,700’ of 8” DR-14 C-900 PVC force main. The purpose of this project is to replace the existing asbestos cement force main, that is about 45 years old and has reached the end of its useful life, with a new 8” DR-14 C-900 PVC force main to reduce the potential of a pipe failure in the foreseeable future which would result in the discharge of wastewater to the environmentally sensitive Intercoastal Waterway.
- Construction will be in Old Port Cove Condominium and along U.S. Hwy 1 just south of Lakeshore Dr. and north of the U.S. Hwy 1 bridge.
- Municipality: The Village of North Palm Beach
- Contractor: TBD
- Construction Engineer: TBD
- Status: Design
- Start Date: TBD
PLANNING AND FUTURE PROJECTS
Preliminary planning for pipeline infrastructure replacement is underway. A planning map depicts future projects with estimated dates of construction. Priority is considered by age, failure history, service history, and materials concerning the likelihood/consequence of failure. Where possible, these project delivery dates may be adjusted to coordinate with projects by others to minimize customer inconvenience. Click here for the planning map.

Hidden Key (Point Way) Low Pressure Force Main
-
- Installation of a Low Pressure Force Main to give residents the ability to connect to SUA’s sewer system.
- Construction will take place on Point Way in the Hidden Key Neighborhood.
- Restoration of all areas disturbed by construction activities, including, but not limited to: Roadways; Driveways; Sidewalks; Existing utilities; Irrigation; Sodding; Landscaping; Mailboxes; Light poles; and Pavement striping.
- Short term lane closures will be required throughout the duration of the project.
- Municipality: Unincorporated Palm Beach County. In the Palm Beach Gardens Area.
- Contractor: Seacoast Utility Construction Team
- Construction Engineer: Seacoast Utility Engineer Team
- Status: Design
- Estimated Start Date: Late 2025.

Lake Park 8A & 8C Water Main Improvements
-
- Installation of a new water main, water services for each residence, and fire hydrants. Replacing a water distribution system that is reaching the end of its useful life.
- Abandonment, or removal and disposal of the existing water main.
- Construction will take place in the Lake Park neighborhoods 8A & 8C between Northlake Blvd and Jasmine Dr. from Prosperity Farms Rd. / 10th St, east to Flagler Blvd.
- Restoration of all areas disturbed by construction activities, including, but not limited to, roadways, driveways, sidewalks, existing utilities, irrigation, sodding, trees, landscaping, mailboxes, light poles, and thermoplastic striping.
- Municipality: Town of Lake Park
- Contractor: TBD
- Design Engineer: CES Consultants
- Status: Design
- Estimated Start Date: End of 2024 / Beginning of 2025.

Horseshoe Acres Water Main Improvements
-
- Installation of a new water main, water services for each residence, and fire hydrants. Replacing a water distribution system that is reaching the end of its useful life. Replacing of a ductile iron pipe water main aerial crossing of the canal between Horseshoe Acres and Steeple Chase with HDPE pipe via Horizontal Directional Drill.
- Abandonment, or removal and disposal of the existing water main.
- Construction will take place in the Horseshoe Acres neighborhood, including streets Kelso Dr, Nashua Dr., Citation Dr., Damascus Dr., Mongo Way., Swaps Way., Travelers Way., and Needles Dr.
- Restoration of all areas disturbed by construction activities, including, but not limited to, roadways, driveways, sidewalks, existing utilities, irrigation, sodding, trees, landscaping, mailboxes, light poles, and thermoplastic striping.
- Municipality: Palm Beach Gardens.
- Contractor: TBD
- Design Engineer: EAC Consulting, INC.
- Status: Design
- Estimated Start Date: End of 2024 / Beginning of 2025

Lift Station 57 Force Main Replacement
-
- Installation of approximately 1,500’ of 6” PVC C900 force main via open cut method, replacing existing ductile iron force main that has reached the end of its useful life.
- Construction will be in the south west corner of the Mariners Cove development, out to Prosperity Farms Rd, and south to Flamingo Rd / Hood Rd.
- Municipality: Unincorporated Palm Beach County in the Palm Beach Gardens Area.
- Contractor: TBD
- Construction Engineer: Chen Moore & Associates
- Status: Pre-Construction
- Start Date: 2025

Harbor Lane Low Pressure Force Main.
-
- Installation of a Low Pressure Force Main to give residents the ability to connect to SUA’s sewer system.
- Construction will take place on Harbor Ln.
- Restoration of all areas disturbed by construction activities, including, but not limited to: Roadways; Driveways; Sidewalks; Existing utilities; Irrigation; Sodding; Landscaping; Mailboxes; Light poles; and Pavement striping.
- Short term lane closures will be required throughout the duration of the project.
- Municipality: Unincorporated Palm Beach County. In the Palm Beach Gardens Area.
- Contractor: TBD
- Construction Engineer: Chen Moore & Associates
- Status: Design
- Estimated Start Date: 2025.

Relocation of 12-inch Water Main and 12-inch Reclaimed Water Main on FIND Property and Ellison Wilson.
-
- Installation of 900 linear feet of 12” ductile iron pipe water main via open cut method including one fire hydrant and one flushing hydrant due to the improvements conducted by the F.I.N.D. on their property.
- Abandonment, or removal and disposal of the existing water mains.
- Construction will take place on the FIND property located at Ellison Wilson Rd and West Hemmingway Dr.
- Restoration of all areas disturbed by construction activities, including, but not limited to, roadways, driveways, sidewalks, existing utilities, irrigation, sodding, trees, landscaping, mailboxes, light poles, and thermoplastic striping.
- Municipality: Palm Beach County.
- Contractor: Deevan, INC
- Construction Engineer: Chen Moore and Associates
- Status: Under construction
Juno Isles West Water Main Improvements
- Installation of a new water main, water services for each residence, and fire hydrants.
- Abandonment, or removal and disposal, of the existing water main.
- The crossing of Ellison Wilson Road with the water main for future connections to service residents east of Ellison Wilson Road.
- Restoration of all areas disturbed by construction activities, including, but not limited to, roadways, driveways, sidewalks, existing utilities, irrigation, sodding, trees, landscaping, mailboxes, light poles, and thermoplastic striping.
- Municipality: Palm Beach County.
- Contractor: Centerline Utilities, Inc. / CES
- Construction Engineer: CES
- Status: In construction
Juno Isles East Water Main Improvements
- Installation of a new water main, water services for each residence, and fire hydrants. Replacing a water distribution system that is reaching the end of its useful life.
- Abandonment, or removal and disposal of the existing water main.
- Construction will take place in the Juno Isles neighborhood between U.S. Hwy 1 and Ellison Wilson Rd. from Ascott Rd. and Packwood Rd. south to Ardley Rd. and Juno Isles Blvd.
- Restoration of all areas disturbed by construction activities, including, but not limited to, roadways, driveways, sidewalks, existing utilities, irrigation, sodding, trees, landscaping, mailboxes, light poles, and thermoplastic striping.
- Municipality: Palm Beach County.
- Contractor: Amici Engineering Contractors
- Construction Engineer: Chen Moore and Associates
- Status: Preconstruction
- Estimated Start Date: February 2025

Donald Ross Road Low Pressure Force Main
- Installation of approximately 300’ of 3” HDPE Low Pressure Force Main horizontally directional drilled under Donald Ross Rd. Installation of approximately 285’ of 2” low pressure force main from Harbor Ln. to the northeast corner of Old Donald Ross Rd. and Paradise Pointe Rd. Installation of approximately 790’ of 2” low pressure force main from Harbor Ln. to the Northwest corner of Old Donald Ross Rd. and Leeward Way.
- Construction will be in the areas of the North East Corner of the Azure development parking lot, underneath Donald Ross Rd., and along Old Donald Ross Rd. from Paradise Pointe Rd. to Leeward Way.
- Municipality: Palm Beach Gardens
- Contractor: Eastern Pipeline Construction
- Construction Engineer: Chen Moore and Associate
- Status: Under Construction

Captains Key Infrastructure Improvement
- Description: Replacement of all water main in the neighborhood that has reached the end of its useful life. Relocation and replacement of fire hydrants. Installation of a Low Pressure Force Main to give residents the ability to connect to SUA’s sewer system.
- Construction will take place in the Captains Key Neighborhood and US Highway 1 / Captains Key Dr. intersection.
- Restoration of all areas disturbed by construction activities, including, but not limited to: Roadways; Driveways; Sidewalks; Existing utilities; Irrigation; Sodding; Landscaping; Mailboxes; Light poles; and Pavement striping.
- Short term lane closures will be required throughout the duration of the project.
- Municipality: Unincorporated Palm Beach County.
- Contractor: Lazarus Group / CES
- Construction Engineer: CES Consultants
- Status: Under Construction.

Leeward Way Low pressure Force Main
- Installation of a Low Pressure Force Main to give residents the ability to connect to SUA’s sewer system.
- Construction will take place on Leeward Way.
- Restoration of all areas disturbed by construction activities, including, but not limited to: Roadways; Driveways; Sidewalks; Existing utilities; Irrigation; Sodding; Landscaping; Mailboxes; Light poles; and Pavement striping.
- Short term lane closures will be required throughout the duration of the project.
- Municipality: Unincorporated Palm Beach County.
- Contractor: TBD
- Construction Engineer: TBD
- Status: Design
- Estimated Start Date: 2025.

Congress Avenue and Avocado Drive Utility Relocation
- Replacement of 420’ of 16” D.I.P water main via open cut, 60’ of 6” D.I.P. water main via open cut, and 420’ of 16” D.I.P. Raw water main via open cut. Replacement of approximately 450’ of 2” HDPE force main inside 52’ of proposed 4” casing and existing 398’ 4” casing, replacement of 100’ of 8” sanitary sewer. Installation of two manholes and two connections to existing system. Upgrading our water and sewer facilities prior to the Congress Avenue extension.
- Construction will take place on Loquat St / Park Ln and Avocado Ln. in the Unincorporated Palm Beach County Area.
- Restoration of all areas disturbed by construction activities, including, but not limited to: Roadways; Driveways; Sidewalks; Existing utilities; Irrigation; Sodding; Landscaping; Mailboxes; Light poles; and Pavement striping.
- Short term lane closures will be required throughout the duration of the project.
- Municipality: Palm Beach County.
- Construction Engineer: Chen Moore and Associates.
- Status: Under Construction.
Questions or comments can be submitted via email at Capital Projects. An email response should be provided within 2 or 3 business days. If your preference is a phone response please leave a name, phone number, and the best time and day to contact you.

Prosperity Farms Road C-17 Bridge-Water Main Replacement
- Description: Replacement of 16” and 12” ductile iron pipe water mains, including an aerial crossing.
- Construction will take place on Prosperity Farms Road from Hummingbird Way, north to Ibis Way.
- Restoration of all areas disturbed by construction activities, including, but not limited to: Roadways; Driveways; Sidewalks; Existing utilities; Irrigation; Sodding; Landscaping; Mailboxes; Light poles; and Pavement striping.
- Short term lane closures will be required throughout the duration of the project.
- Municipality: North Palm Beach.
- Contractor: TBD.
- Construction Engineer: Chen Moore and Associates.
- Status: Design.
- Start Date: TBD.

CRYSTAL POINTE FORCE MAIN REPLACEMENT
- Installation of approximately 1,387’ of 6” HDPE force main via horizontal directional drill and 815’ of 6” PVC C-900 Dr-14 force main via open cut method, replacing existing ductile iron force main that has reached the end of its useful life.
- Construction will be in Crystal Pointe neighborhood of Palm Beach Gardens, FL. From the Lift station NO. 95, located in the Crytal Pointe clubhouse parcel, along the west plat line of Crystal Pointe, to the existing manhole at the north Hood Rd. right of way line.
- Municipality: Unincorporated Palm Beach County
- Contractor: Jamie Underground, Inc.
- Construction Engineer: CES Consultants, Inc.
- Status: Pre Construction
- Start Date: End of 2024

Pirates Cove Water Main Replacement and Low-Pressure Force Main
- Description: Replacement of all water main in the neighborhood that has reached the end of its useful life. Relocation and replacement of fire hydrants. Installation of a Low-Pressure Force Main to give residents the ability to connect to SUA’s sewer system.
- Abandonment or removal and disposal of the existing water main.
- Construction will take place in the Pirates Cove neighborhood on streets including Kidd Ln., Teach Rd., E. Teach Rd., and Avery Rd.
- Restoration of all areas disturbed by construction activities, including, but not limited to: Roadways; Driveways; Sidewalks; Existing utilities; Irrigation; Sodding; Landscaping; Mailboxes; Light poles; and Pavement striping.
- Short-term lane closures will be required throughout the duration of the project.
- Municipality: Unincorporated Palm Beach County. In the Palm Beach Gardens Area.
- Contractor: CES
- Construction Engineer: CES Consultants
- Status: Design
- Estimated Start Date: TBD.

Old Port Cove Force Main Replacement
- Installation of approximately 1,700’ of 8” DR-14 C-900 PVC force main. The purpose of this project is to replace the existing asbestos cement force main, that is about 45 years old and has reached the end of its useful life, with a new 8” DR-14 C-900 PVC force main to reduce the potential of a pipe failure in the foreseeable future which would result in the discharge of wastewater to the environmentally sensitive Intercoastal Waterway.
- Construction will be in Old Port Cove Condominium and along U.S. Hwy 1 just south of Lakeshore Dr. and north of the U.S. Hwy 1 bridge.
- Municipality: The Village of North Palm Beach
- Contractor: TBD
- Construction Engineer: TBD
- Status: Design
- Start Date: TBD

PLANNING AND FUTURE PROJECTS
Preliminary planning for pipeline infrastructure replacement is underway. A planning map depicts future projects with estimated dates of construction. Priority is considered by age, failure history, service history, and materials concerning the likelihood/consequence of failure. Where possible, these project delivery dates may be adjusted to coordinate with projects by others to minimize customer inconvenience. Click here for the planning map.